Was Ake’ Building
Wagner, SD · 22,960 sf · restored in 10 working days, with the original 1994 panels kept in place.
A 1994 standing seam at the end of its life
- Actively leaking, with stained ceiling tile throughout the interior
- Failing seams, with earlier repairs delaminating across the field
- Loose and missing fasteners at the gutter edge, seam overlaps, and flashings
- Surface rust across the whole roof, from minimal to moderately severe
- Graded D+, with under two years of service life remaining
A sealed, warranted metal roof
- Severe rust mechanically removed and primed
- Loose and missing screws replaced across the roof
- Every seam, bolt, and penetration sealed with flashing-grade product
- A seamless fluid-applied membrane over the entire field
- The original panels kept in place — no tear-off
Measured change

How the roof was renewed
- 1
Wash
Pressure-washed the surface with Gaco roof wash to strip oxidation and lift the loose, failing sealants left by earlier repairs.
- 2
De-rust
Mechanically removed the severe rust. Spot repairs cannot solve rust at this coverage — it simply returns and spreads.
- 3
Re-fasten
Replaced the loose and missing screws along the gutter edge, seam overlaps, and edge flashings before anything went over them.
- 4
Prime
Gaco rust primer over the severely rusted areas, then GacoFlex E5320 across the surface to guarantee adhesion.
- 5
Seal
Sealed every seam, bolt, penetration, and protrusion with approved flashing-grade products — the exact points the roof was leaking through.
- 6
Coat
Finished with the approved topcoat, closing the roof into one seamless waterproof membrane with no laps left to fail.
Leak-free warranty
- Installed to specification MR-S20-38-20
- Factory-inspected
- Original 1994 panels kept in place
- Renewable with a wash and recoat
Renewed, not replaced
A metal roof can be replaced with another metal roof, and the new one still has end laps, vertical seams, and thousands of screws — every one of them a way in for water. Restoring instead puts a seamless membrane over the panels that are already there. The building below, offices and conference space for the Yankton Sioux Tribe, stayed in use throughout, and a wash and recoat at the end of the term starts the cycle again.
A roof from 1994, still working — without a tear-off.